Equipment and Calibration
View History
Equipment Entry
|
Documents
Calibration: Hukseflux_HFP01_11328.pdfPackingSlip: ps_Campbell_20150928.pdf
History
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
3634 | 2012-01-09 | Lab none | Installed | Tonzi | Installed in the Campbell Enclosure at SP2 near the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. |