Equipment and Calibration History

View Equipment |

View history entry 6912 for Delta-T ML3 sn: M003369

Date: 2024-10-09
From: Bouldin Alfalfa - Soil Moisture Probe Theta
To: Bouldin Alfalfa - Soil Moisture Probe Theta
Title: Moved
Notes: BA tower was moved temporarily to the edge of the field by the ditch to make way for plowing/planting. This sensor was removed from the field and reinstalled under the temporary tower location.
Entered by: Daphne Szutu
Field notes