Date: |
2024-10-10 |
From: |
Lab - none |
To: |
Tonzi - Gas Analyzer CH4 Floor |
Title: |
Installed |
Notes: |
Installed on the Floor tower by adding a new mount using L-brackets and a rail fitting removing existing Allen screws and reusing the sockets for standard 1/4-20 bolts. No wash box, hat but no spikes. |
Entered by: |
Joe Verfaillie |
|
|