Date: |
2024-10-10 |
From: |
Lab - none |
To: |
Tonzi - Gas Analyzer CH4 Tower |
Title: |
Installed |
Notes: |
Installed on top of the Tower by adding a new mount using L-brackets and a rail fitting removing existing Allen screws and reusing the sockets for standard 1/4-20 bolts. Wash box and spiked hat also installed. |
Entered by: |
Joe Verfaillie |
|
|