Equipment and Calibration

View History

Equipment Entry

Instrument:Interface
Manufacture:Campbell Sci.
Model No:CE4
Serial No:1327
Tag No:
Acquisition Date:2018-06-26
Project:OSU AirMOSS
Location on 2018-06-26:Tonzi,
Notes: Acquired from the OSU AirMOSS project, Location SP03-23

Documents

No documents found

History

Rec No.DateLoc FromTitleLoc ToNotes
3614 2012-01-09 Lab none Installed Tonzi Installed in the Campbell Enclosure at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ.