Equipment and Calibration History
View Equipment |
Date: |
2024-02-27 |
From: |
Lab - none |
To: |
Tonzi - CO2 Probe Tower Profile 23 |
Title: |
Installed |
Notes: |
Reinstalled in the top location of the Tower co2 profile after testing in the lab. Reinstalled cable. |
Entered by: |
Joe Verfaillie |
|
|
Field notes