Equipment and Calibration History
View Equipment |
Date: |
2012-05-21 |
From: |
Lab - none |
To: |
DWR Corn - |
Title: |
Installed |
Notes: |
Installed on a temporary boom at the top northwest corner of the scaffolding at the DWR Corn site. This sensor is facing down collecting Reflected PAR |
Entered by: |
|
|
|
Field notes