Equipment and Calibration History
View Equipment |
Date: |
2022-11-02 |
From: |
Bouldin Alfalfa-ADEX - Solar Panel Bouncer B |
To: |
Lab - none |
Title: |
Removed |
Notes: |
Removed from about 10m south of the Bouncer tower at the end of the 2022 advection experiment |
Entered by: |
Joe Verfaillie |
|
|