Equipment and Calibration History
View Equipment |
Date: |
2022-09-16 |
From: |
Hill Slough - Turbidity Channel |
To: |
Lab - none |
Title: |
Removed |
Notes: |
Removed as part of the EXO2 sonde deployed in the channel at HS. Brought back to the lab for cleaning and calibration. |
Entered by: |
Daphne Szutu |
|
|
Field notes