Equipment and Calibration History
View Equipment |
Date: |
2022-08-16 |
From: |
Lab - none |
To: |
Gilbert Tract - none |
Title: |
Installed |
Notes: |
Installed at GT in the reflected position and data collected in a separate data table for an NDVI intercomparison. |
Entered by: |
Daphne Szutu |
|
|
Field notes