Equipment and Calibration History

View Equipment |

View history entry 5901 for Fabricated BB-Fab sn: BB-HS

Date: 2021-03-11
From: Sherman Wetland-Temp1 - Battery Bank
To: Hill Slough - Battery Bank
Title: Installed
Notes: We put the battery box from SW on the west side of the platform and installed the five group 31 flooded batteries from the SW temporary tower. The solar controller sn 11400080 and breakers from the SW temporary site were also installed in the battery box. The wiring is not optimal and should be cleaned up. Also because the drill battery died we could not mount the solar controller or bolt the battery box to the platform.
Entered by: Joe Verfaillie
Field notes