Equipment and Calibration History

View Equipment |

View history entry 5845 for Campbell Sci. HygroVUE10 sn: E3514

Date: 2022-04-25
From: Lab - none
To: Bouldin Alfalfa-ADEX - RH & Temp Main Lower
Title: Installed
Notes: Installed on the existing eddy post at the main tower at 2.42m alg for the advection experiment at BA
Entered by: Joe Verfaillie