Equipment and Calibration History
View Equipment |
Date: |
2022-04-25 |
From: |
Lab - none |
To: |
Bouldin Alfalfa-ADEX - Anemometer Bouncer Upper |
Title: |
Installed |
Notes: |
Installed on top of the Bouncer tower at 3.96m alg for the advection experiment at BA |
Entered by: |
Joe Verfaillie |
|
|