Date: |
2022-05-10 |
From: |
Vaira - Battery Bank Main |
To: |
Vaira - Battery Bank Main |
Title: |
Maintenance |
Notes: |
Fixed broken wire between the two banks of solar panels. Disconnected and load tested all the batteries. Two batteries, second from north in each box, tested bad. These were moved to the north most position and left disconnected. The other six tested good and were reconnected. |
Entered by: |
Joe Verfaillie |
|
|