Equipment and Calibration History
View Equipment |
Date: |
2022-02-09 |
From: |
Tonzi - |
To: |
Lab - none |
Title: |
Removed |
Notes: |
Removed from OSU SP2 with the dying battery. Replaced with a power line from the Tower battery bank. |
Entered by: |
Joe Verfaillie |
|
|
Field notes