Rec No. | Date | Loc From | Title | Loc To | Notes |
7285 |
2025-05-30 |
Lab none |
Shipped |
Factory none |
Brian Wang from Ameriflux pick up our three big tanks and their four small tanks recovered from USGS. It will take about three months for Ameriflux to fill our tanks with 550 ppm CO2, 4 ppb CH4. |
7281 |
2025-05-22 |
Lab none |
Maintenance |
Lab none |
Hydrotested at Bay Cities Pyrotector in Emeryville. The cost was $80 each and I paid with credit card on pickup. I dropped the cylinder off during the week and they were ready a few days later. Next test due in May 2030. |
2913 |
2006-10-30 |
Factory |
Calibration |
Factory |
Calibrated at NOAA-CDML to WMO standards: 2240.76ppm CO2 SDEV 0.08ppm. Document on file |
2247 |
2001-03-01 |
Factory |
Tested |
Factory |
Original hydrostatic test 03A01 (March 2001). Next due March 2006. |