Equipment and Calibration History

History for Luxfer NOAA-CMDL CA03923

Rec No.DateLoc FromTitleLoc ToNotes
7284 2025-05-30 Lab none Shipped Factory none Brian Wang from Ameriflux pick up our three big tanks and their four small tanks recovered from USGS. It will take about three months for Ameriflux to fill our tanks with 550 ppm CO2, 4 ppb CH4.
7280 2025-05-22 Lab none Maintenance Lab none Hydrotested at Bay Cities Pyrotector in Emeryville. The cost was each and I paid with credit card on pickup. I dropped the cylinder off during the week and they were ready a few days later. Next test due in May 2030.
5422 2021-08-16 Factory none Returned Lab none Returned from LBNL by Sebastien after refill and calibration.
5421 2021-07-22 Factory none Calibration Factory none Calibrated by Ameriflux at LBNL CO2: 488.75 +/- 0.02ppm, CH4: 3386.5 +/- 0.4ppb, H2O -6.24 +/- 1.34ppm. 2000psi.
5417 2021-05-26 Lab none Shipped Factory none Sent to Ameriflux at LBL for refill.
2903 2017-07-05 Factory Returned Lab none Returned from Ameriflux at LBNL
2909 2017-06-23 Factory Calibration Factory Calibrated by Ameriflux at LBNL CO2: 474.19 +/- 0.01ppm, CH4: 3121.0 +/- 0.1ppb, H2O 81.47 +/- 1.55ppm
2902 2017-05-11 Lab none Shipped Factory Sent to Ameriflux at LBNL to be filled with CO2, CH4, H2O standard.
2682 2017-04-01 Lab none Maintenance Lab none Hydrotested at Bay Cities Pyrotector in Emeryville. The cost was and we paid with credit card on pickup. Joe and I dropped the cylinder off during the week and Joe picked it up a few days later. Next test due in April 2022.
2896 1999-09-01 Factory Calibration Factory Calibrated at NOAA-CDML to WMO standards: CO2 344.95ppm 0.01ppm SDEV balanced in dry air
2897 1999-08-16 Factory Calibration Factory Scott-Marrin Inc. Report on Analysis 347 +/- 3ppm CO2 balanced in ultrapure air. Document on file.
2249 1999-02-01 Factory Tested Factory Original hydrostatic test 02A99 (February 1999). Next due February 2004.