Date: |
2021-11-23 |
From: |
Mayberry - Forced Diffusion Boom |
To: |
Lab - none |
Title: |
Removed |
Notes: |
Removed from MB floating boom and brought back to the lab for testing. It underwent a lot of power cycles because of a short in the system and I want to test it before we deploy it again. |
Entered by: |
Daphne Szutu |
|
|