Equipment and Calibration History
History for Luxfer NOAA-CMDL CA04119
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
7283 | 2025-05-30 | Lab none | Shipped | Factory none | Brian Wang from Ameriflux pick up our three big tanks and their four small tanks recovered from USGS. It will take about three months for Ameriflux to fill our tanks with 550 ppm CO2, 4 ppb CH4. |
7282 | 2025-05-22 | Factory none | Maintenance | Factory none | Hydrotested at Bay Cities Pyrotector in Emeryville. The cost was $80 each and I paid with credit card on pickup. I dropped the cylinder off during the week and they were ready a few days later. Next test due in May 2030. |
2905 | 2017-07-05 | Factory | Returned | Lab none | Returned from Ameriflux at LBNL |
2910 | 2017-06-23 | Factory | Calibration | Factory | Calibrated by Ameriflux at LBNL CO2: 524.77 +/- 0.03ppm, CH4: 4223.8 +/- 0.4ppb, H2O 99.57 +/- 0.89ppm |
2904 | 2017-05-11 | Lab none | Shipped | Factory | Sent to Ameriflux at LBNL to be filled with CO2, CH4, H2O standard. |
2683 | 2017-04-01 | Lab none | Maintenance | Lab none | Hydrotested at Bay Cities Pyrotector in Emeryville. The cost was and we paid with credit card on pickup. Joe and I dropped the cylinder off during the week and Joe picked it up a few days later. Next test due in April 2022. |
2899 | 2000-04-04 | Factory | Calibration | Factory | Calibrated at NOAA-CDML to WMO standards: 421.22ppm +/- 0.14ppm CO2 SDEV 0.04ppm. Document on file |
2898 | 1999-12-22 | Factory | Calibration | Factory | Scott-Marrin Inc. Report on Analysis 430 +/- 4ppm CO2 balanced in ultrapure air. Document on file. |
2250 | 1999-06-01 | Factory | Tested | Factory | Original hydrostatic test 06A99 (June 1999). Next due June 2004. |