Equipment and Calibration History
View Equipment |
Date: |
2021-09-03 |
From: |
Lab - none |
To: |
Bouldin Alfalfa - none |
Title: |
Installed |
Notes: |
Installed on the BA bouncer tower for the advection experiment in the lower T/RH location |
Entered by: |
Daphne Szutu |
|
|
Field notes