Equipment and Calibration History
View Equipment |
Date: |
2012-02-09 |
From: |
Tonzi - Solar Panel Floor H |
To: |
Lab - none |
Title: |
Removed |
Notes: |
Removed from the Floor solar system. This panel has not been connected to the system since at least August 2008 |
Entered by: |
Joe Verfaillie |
|
|
Field notes