Equipment and Calibration History
View Equipment |
Date: |
2012-07-19 |
From: |
Lab - none |
To: |
Sherman Island - Soil Moisture Probe SoilCO2 B |
Title: |
Installed |
Notes: |
Installed next to the west soil co2 profile at -2cm |
Entered by: |
Joe Verfaillie |
|
|
Field notes