Date: |
2021-04-14 |
From: |
Factory - none |
To: |
Lab - none |
Title: |
Repair |
Notes: |
The following were replaced: spinning mirror motor and base plate assembly, spars, digital board (had water damage in area of RTC), pressure sensor (was totally soaked and corroded). Factory calibration on 2021-03-25. |
Entered by: |
Daphne Szutu |
|
|