Equipment and Calibration History
View Equipment |
Date: |
2021-03-25 |
From: |
Lab - none |
To: |
Hill Slough - Forced Diffusion A |
Title: |
Installed |
Notes: |
Installed at Hill Slough on the ground to the southwest of the Tower platform. |
Entered by: |
Joe Verfaillie |
|
|
Field notes