Equipment and Calibration History
View Equipment |
Date: |
2021-03-25 |
From: |
Lab - none |
To: |
Hill Slough - Net Radiometer 4-way |
Title: |
Installed |
Notes: |
Installed at Hill Slough at the end of the radiation boom. The NR-LITE was moved back along the boom. |
Entered by: |
Joe Verfaillie |
|
|
Field notes