Equipment and Calibration History
View Equipment |
Date: |
2020-12-18 |
From: |
Tonzi - none |
To: |
Lab - none |
Title: |
Removed |
Notes: |
Removed from OSU SP1 for experiments in the lab. The cable was disconnected inside the tipping bucket and left in place in the field. |
Entered by: |
Joe Verfaillie |
|
|
Field notes