Equipment and Calibration History
View Equipment |
Date: |
2017-06-01 |
From: |
Lab - none |
To: |
East End-Temp1 - Solar Panel B |
Title: |
Installed |
Notes: |
Installed at the East End Temporary Tower #1 Open Water location with the initial set up of this site. |
Entered by: |
Joe Verfaillie |
|
|