Date: |
2019-10-22 |
From: |
West Pond - Gas Analyzer CH4 |
To: |
West Pond - Gas Analyzer CH4 |
Title: |
Calibration |
Notes: |
Calibration Location: West Pond
Last calibration: 2019-04-11
RSSI=72%, Optical RH=27%
Ambient P=101.8kPa, Tair=27.2C
Zero Air at 1300psi, AMP CA03923 3.121 at 1200
CH4 Zero Offset: 0.043ppm
CH4 Span Offset: 0.000ppm
Notes: Was stabilizing at 0.033 for zero but went up after adjusting gas flow. Optics desiccant swapped after calibration. Cal gas used to dry head space. New RH about 10%
|
Entered by: |
|
|
|