Equipment and Calibration History
View Equipment |
Date: |
2019-07-02 |
From: |
Lab - none |
To: |
Tonzi - |
Title: |
Installed |
Notes: |
Installed at the top of the tower east of the southeast corner. Should be remounted on the radiation boom. |
Entered by: |
Joe Verfaillie |
|
|
Field notes