Date: |
2011-05-25 |
From: |
Lab - none |
To: |
Mayberry - DO Sensor B |
Title: |
Installed |
Notes: |
Installed on the Mayberry Tule Tower after being repaired in the lab. The broken cable was spliced near the sensor head. The sensor innards were also soaked in vinegar and electrolyte was replaced. |
Entered by: |
|
|
|