Equipment and Calibration History
View Equipment |
Date: |
2012-01-09 |
From: |
Lab - none |
To: |
Tonzi - |
Title: |
Installed |
Notes: |
Installed at -10cm at SP3 southeast of the Tower. This is the initial setup of the site by Richard Cuenca and Yutaka Hagimoto of Oregon State Univ. |
Entered by: |
Joe Verfaillie |
|
|