Equipment and Calibration History
View Equipment |
Date: |
2010-12-09 |
From: |
Lab - none |
To: |
Mayberry - |
Title: |
Installed |
Notes: |
Installed at Mayberry to bolster solar power system for LI-7700. Temporary mount until I remember to bring a drill. |
Entered by: |
Joe Verfaillie |
|
|
Field notes