Equipment and Calibration History
View Equipment |
Date: |
2018-04-17 |
From: |
Lab - none |
To: |
East Pond - Solar Panel C |
Title: |
Installed |
Notes: |
Installed at EP tower as part of initial site set up about 12m NNW of the tower |
Entered by: |
Joe Verfaillie |
|
|
Field notes