Equipment and Calibration History

View Equipment |

View history entry 3430 for Kyosera KD140SX-UFBS sn: 11ZV0M0836

Date: 2018-04-17
From: Lab - none
To: East Pond - Solar Panel B
Title: Installed
Notes: Installed at EP tower as part of initial site set up about 12m NNW of the tower
Entered by: Joe Verfaillie
Field notes