Equipment and Calibration History
View Equipment |
Date: |
2011-03-01 |
From: |
Lab - none |
To: |
Mayberry - Multiplexer Met |
Title: |
Installed |
Notes: |
Installed at the new Mayberry Tule Tower in about 1m of mater near a tule patch about 65m north east of the Mayberry tower. |
Entered by: |
|
|
|
Field notes