Equipment and Calibration History
View Equipment |
Date: |
2018-03-06 |
From: |
Lab - none |
To: |
Tonzi - |
Title: |
Installed |
Notes: |
Installed at Tonzi to try to fix the CR10x running the tower's old CO2 profile system. It replaced sn 20138. |
Entered by: |
Daphne Szutu |
|
|
Field notes