Equipment and Calibration History
View Equipment |
Date: |
2017-09-28 |
From: |
Tonzi - |
To: |
Tonzi - |
Title: |
Upgrade |
Notes: |
The Tonzi Tower battery bank was rewired to be a 24V system for the upgrade of the solar power system. |
Entered by: |
Joe Verfaillie |
|
|
Field notes