Equipment and Calibration History
View Equipment |
Date: |
2017-08-25 |
From: |
Tonzi-Tower - |
To: |
Lab - none |
Title: |
Removed |
Notes: |
Removed from Tonzi Tower and brought back to the lab. It is a redundant measurement with the 4-way radiometer. Cables are decayed and need to be replaced. |
Entered by: |
Daphne Szutu |
|
|