Date: |
2017-08-04 |
From: |
East End-Temp2 - Solar Controller |
To: |
Lab - none |
Title: |
Removed |
Notes: |
Removed from the East End Temporary Tower 2 Closed Canopy location. The Solar input terminals looked fried and it was no longer providing power to the tower. |
Entered by: |
Joe Verfaillie |
|
|