Equipment and Calibration History
View Equipment |
Date: |
2017-06-05 |
From: |
Lab - none |
To: |
East End - Narrow Band NDVI Reflected |
Title: |
Installed |
Notes: |
Installed on the East End tower to measure outgoing/reflected light. |
Entered by: |
Joe Verfaillie |
|
|
Field notes