Equipment and Calibration History
View Equipment |
Date: |
2017-06-01 |
From: |
Twitchell Rice - 0 |
To: |
East End-Temp1 - Solar Panel A |
Title: |
Moved |
Notes: |
Installed at the East End Temporary Tower #1 Open Water location with the initial set up of this site. |
Entered by: |
Joe Verfaillie |
|
|