Equipment and Calibration History
View Equipment |
Date: |
2017-06-01 |
From: |
Tonzi-Tower - |
To: |
Lab - none |
Title: |
Removed |
Notes: |
Removed from the lowest position of CO2 profile system on the Tonzi Tower. At least one has not been working and all need to be compared against each other for drift. |
Entered by: |
Joe Verfaillie |
|
|