Date: |
2017-05-11 |
From: |
Lab - none |
To: |
Tonzi-Floor - |
Title: |
Installed |
Notes: |
Installed at the Tonzi Floor tower. I uploaded a new config file and updated the pressure coefficients. The old IRGA head, sn 0418, was moved to a temporary mount on the same tower so we can compare the old and new heads. |
Entered by: |
Daphne Szutu |
|
|