Equipment and Calibration History
View Equipment |
Date: |
2017-04-26 |
From: |
Lab - none |
To: |
Bouldin Corn - Narrow Band PRI Incoming |
Title: |
Installed |
Notes: |
Installed at the Bouldin Corn site with the initial set up of the tower. |
Entered by: |
Joe Verfaillie |
|
|
Field notes