Equipment and Calibration History
View Equipment |
Date: |
2016-11-21 |
From: |
East End - CO2 probe |
To: |
Lab - none |
Title: |
Removed |
Notes: |
Removed from East End where it was pulling about 6A of power and browning out the entire site. |
Entered by: |
Joe Verfaillie |
|
|
Field notes