Date: |
2016-11-22 |
From: |
Lab - none |
To: |
Bouldin Alfalfa - Soil Moisture Probe B |
Title: |
Installed |
Notes: |
Installed at the Bouldin Alfalaf Tower to replace the on destroyed by the mower. It was buried horizontally at about 2.5cm depth. The data logger program was not updated for the new SDM address until 2016-12-21 |
Entered by: |
Joe Verfaillie |
|
|