Equipment and Calibration History
View Equipment |
Date: |
2002-12-06 |
From: |
Lab - none |
To: |
Tonzi-Floor - |
Title: |
Installed |
Notes: |
Installed on CR23x3 with the soil moisture probes at Tonzi. On the floor to the east of the tower. |
Entered by: |
Joe Verfaillie |
|
|