Equipment and Calibration History
View Equipment |
Date: |
2016-05-24 |
From: |
Lab - none |
To: |
Sherman Wetland - PAR Sensor Incoming |
Title: |
Installed |
Notes: |
Installed on the Sherman Wetland tower at the initial set up of the site. It is in the incoming posistion. |
Entered by: |
Joe Verfaillie |
|
|
Field notes