Equipment and Calibration History
View Equipment |
Date: |
2009-08-25 |
From: |
Lab - none |
To: |
Sherman Island - |
Title: |
Installed |
Notes: |
Installed at Sherman Island to replace the scroll pump that seized. This pump had 2591.9 hours on it when installed. |
Entered by: |
|
|
|
Field notes