Equipment and Calibration History
View Equipment |
Date: |
2014-03-07 |
From: |
East End - Battery Bank |
To: |
East End - Battery Bank |
Title: |
Moved |
Notes: |
The battery bank and solar panels were moved from the south side of the tower to a new scaffolding to the south of the tower. |
Entered by: |
Joe Verfaillie |
|
|
Field notes