Equipment and Calibration History

View Equipment |

View history entry 2216 for Fabricated BB-Fab sn: BB-EE

Date: 2014-03-07
From: East End - Battery Bank
To: East End - Battery Bank
Title: Moved
Notes: The battery bank and solar panels were moved from the south side of the tower to a new scaffolding to the south of the tower.
Entered by: Joe Verfaillie
Field notes